Bathroom remodel quotes in the Charlotte area

Describe your bathroom project to our agent. It works for you: it writes up one scope, matches you with up to five local contractors who are insured, and licensed where the state requires it, and puts their written quotes side by side. Contractors see your project, not your phone number, until you choose to share it.

How it works

  1. Tell the agent about the bathroom. Its size, what is there now, what stays, what goes, and whether anything moves. It asks follow-up questions and turns your answers into one written scope, so every contractor prices the same job.
  2. Verify your phone by text code. This confirms the request is real. It does not hand your number to anyone.
  3. Get up to five written quotes. They arrive in one place. The agent lines them up and explains the differences in plain terms.
  4. Ask questions, then choose. Message contractors through QuoteFlash. Only the ones you pick get your phone number.

Contractors pay QuoteFlash when they are matched with you. You pay nothing.

Why bathroom quotes vary more than any other project

A roof is a roof. A "bathroom remodel" can mean a new vanity and paint, or a room taken back to the studs with the shower moved to another wall. Contractors asked to "quote the bathroom" each imagine a different job, and the prices reflect that. We do not publish a Charlotte price range for this reason. These are the things that move the number:

  • Layout. Keeping the toilet, shower and sink where they are is the largest saving available. Moving a drain means opening the floor, and on a concrete slab that means cutting concrete.
  • The shower or tub. A one-piece unit, wall panels and site-built tile are three different jobs. So is converting a tub to a shower.
  • Tile. Area, material, size and pattern. Small or patterned tile takes more labor.
  • Waterproofing. What goes behind and under the tile. It is invisible when finished and differs between quotes.
  • Fixtures and finishes. Vanity, top, faucets, valve, toilet, glass, lighting. Quotes cover these with named products or with allowances, and allowances can be set low.
  • Electrical. New circuits, added outlets, a fan, heated floor.
  • What is behind the walls. Water damage, old supply or drain pipes, subfloor rot. Unknown until demolition.

Write one scope, so five quotes can be compared

Decide these before anyone prices the job. The agent walks you through them.

  • Does every fixture stay where it is, or does something move?
  • Tub: keep, replace, or convert to a shower?
  • Shower walls: tile, panels or a one-piece unit? Glass door or curtain?
  • Floor: new tile or other material, and is the subfloor being replaced?
  • Vanity: same width or different? One sink or two?
  • Lighting, fan and outlets: same places, or added?
  • Who buys the fixtures and tile, you or the contractor?
  • Walls and ceiling: patch and paint, or new board?

What a complete bathroom quote lists

  • Demolition: what is removed, and disposal
  • Plumbing: each fixture replaced in place or moved, new valves, and the name and state license number of the plumbing contractor
  • Electrical: each item added or changed, and the name and license number of the electrical contractor
  • Shower or tub: product, or for tile the pan type and the waterproofing method behind the tile
  • Tile: square feet, where it goes, material allowance per square foot, layout and grout
  • Fixtures: brand and model for each, or the allowance amount for each
  • Vanity, top, mirror, glass and accessories
  • Wall board type in wet areas, and painting
  • Fan: model, and where it vents
  • Subfloor or framing repair: unit price, and what is included
  • Hidden damage: how it is priced and approved before extra work starts
  • Permits and inspections: which are needed and who handles them
  • Start date, duration, and how many days the room is out of use
  • Payment schedule tied to stages of work, and written workmanship warranty

Allowances are where bathroom quotes hide their differences. Two quotes with the same total can assume very different tile and fixtures. Put the allowance figures side by side. For the general method, see how to read a contractor quote.

Which parts of a bathroom remodel need a permit

North Carolina exempts work on a single-family home costing $40,000 or less from a building permit, unless it involves structure, a change to the plumbing, heating and cooling, or electrical work beyond a like-kind swap. A bathroom touches most of that list, so the answer depends on the scope.

New tile, paint, vanity top, mirror, accessoriesNo permitNone of the exceptions applies, if the whole job is $40,000 or less.
Replace a toilet, faucet, sink or tub in the same place, same sizeNo permitPlumbing replacements that do not change size or capacity are exempt.
Move or add a drain, supply line or fixturePermitAdding to or changing the design of the plumbing needs a permit at any price.
Swap a light fixture, switch or outlet like for likeNo permitLike-kind replacement of electrical devices and light fixtures is exempt.
Add a circuit, an outlet, new wiring or electric floor heatPermitAdding to or changing electrical wiring or equipment needs a permit at any price.
Remove or alter a load-bearing wall, or repair floor joistsPermitLoad-bearing structure needs a permit at any price.
Any bathroom job over $40,000PermitThe exemption stops at $40,000.

A tub-to-shower conversion can fall on either side, depending on whether the drain and valve change. Ask each contractor to state in the quote whether their scope needs a plumbing permit. When one job needs several permits, a local government may not require more than one building permit for simultaneous projects at the same address under the residential code. Mecklenburg County Code Enforcement issues permits; its number for code questions is 980-314-CODE (2633). More in our permit guide for Charlotte-area home projects.

Who has to be licensed

Three state rules meet in a bathroom. Plumbing needs a state license at any price. Electrical contracting needs a state license, with no dollar threshold. A general contractor license is required when the whole job is $40,000 or more.

A remodeler running a smaller job may not hold the plumbing or electrical license personally. That is fine as long as licensed contractors do those parts. Ask who they are, get the license numbers in the quote, and look them up. If the house was built before 1978, the firm must also be certified in lead-safe practices, because demolition disturbs painted surfaces.

Things specific to bathrooms in the Charlotte area

Slab or crawlspace. Homes here are built both ways. Over a crawlspace, a plumber can reach drains from below. On a slab, moving a drain means cutting the floor. Tell the agent which you have, because it changes the layout decision more than anything else.

Water heater. A larger tub or a second shower head can be the moment an undersized heater shows itself. See water heater quotes.

Bathroom remodel questions

How much does a bathroom remodel cost in Charlotte?

It depends almost entirely on scope: whether fixtures move, what the shower is made of, how much tile, and the fixtures chosen. We do not publish a range we cannot stand behind. Several written quotes for one written scope will give you a real number.

Do I need a permit to remodel a bathroom in Charlotte?

Not for finishes and same-place fixture swaps on a job of $40,000 or less. You do if plumbing is moved or added, wiring is added or changed, load-bearing structure is touched, or the job costs more than $40,000.

Why are my bathroom quotes so far apart?

Usually the scopes differ, or the allowances do. Check whether each quote moves the same fixtures, uses the same shower construction, and assumes the same tile and fixture allowances.

How long does a bathroom remodel take?

It depends on scope, inspections and how long ordered items take to arrive. Each quote should state a start date, a duration, and how many days the room will be out of use.

Who sees my phone number?

Only the contractors you choose. Contractors see your project details and send written quotes through QuoteFlash. You read them, ask questions in the same place, and decide which contractors get your number.

One minute now. Up to five quotes to compare.

Get my quotesFree, no obligation, and you choose who gets your number