How it works
- Tell the agent about the fence or deck. For a fence: rough length, height, material, gates, slope, and whether an old fence comes out. For a deck: size, height off the ground, new build or repair, and what the boards and railing should be. It asks follow-up questions so every contractor prices the same job.
- Verify your phone by text code. This confirms the request is real. It does not hand your number to anyone.
- Get up to five written quotes. They arrive in one place. The agent lines them up and explains the differences in plain terms.
- Ask questions, then choose. Message contractors through QuoteFlash. Only the ones you pick get your phone number.
Contractors pay QuoteFlash when they are matched with you. You pay nothing.
Three approvals people confuse
Fences and decks can involve three approvals from three places. Sort them out before you sign.
What drives the price
Fences
- Length and height. Priced by the linear foot, and more for taller fences.
- Material and style. Pressure-treated pine, cedar, vinyl, aluminum and chain link sit at different price points. So do picket, privacy and shadowbox styles in the same wood.
- Gates. Each one adds posts, hardware and labor. Wide double gates add more.
- Ground. Slopes, roots, rock and poor access slow the post work.
- Old fence. Removal and haul-away, or not.
Decks
- Size and height. A deck high off the ground needs longer posts, more bracing, stairs and railings.
- Structure. New framing and footings, or new boards on a frame that is sound. These are two different jobs with very different prices.
- Decking and railing. Pressure-treated wood, composite and PVC boards, and wood, aluminum or cable railings.
- Stairs, and extras. Each stair run, plus lighting, built-in seating or a roof.
- Permit and drawings. Part of any new deck or structural repair.
What a complete fence quote lists
- Total linear feet, with a sketch of where the fence runs
- Height, style, and which side faces out
- Material and grade for posts, rails and pickets, or the product line for vinyl and aluminum
- Post size, spacing, depth, and whether posts are set in concrete
- Gates: number, width, hardware and latches
- How slopes are handled: stepped panels or following the ground
- Removal and disposal of the old fence, and any clearing
- Who has underground utilities marked before digging
- Who confirms the property line, and what happens if it is disputed
- Stain or sealer: included or not
- Warranty on material and workmanship, start date, duration and payment schedule
What a complete deck quote lists
- Dimensions, height off the ground, and a drawing
- Attached to the house or freestanding, and how the connection to the house is made and flashed
- Footings: number, size and depth
- Framing lumber: sizes and spacing for posts, beams and joists
- Decking: brand, line and color, and how it is fastened
- Railing: type, material and height
- Stairs: number of steps, width and landing
- For a repair: exactly which parts are replaced and which are kept
- Demolition and disposal of the old deck
- Permit, drawings and inspections: who handles each
- Warranty on material and workmanship, start date, duration and payment schedule
For the general method, see how to read a contractor quote.
Building permits: a deck's structure versus its boards
North Carolina exempts work on a single-family home costing $40,000 or less from a building permit, but not when load-bearing structure is added, repaired or replaced. A deck is structure. The statute carves out only its surface parts, and State Fire Marshal guidance confirms the split.
A "re-deck" quote that turns into new joists partway through has become a permit job. Ask each builder what happens then. For a retaining wall or an unusually tall fence, call the county before work starts. Mecklenburg County Code Enforcement issues building permits; its number for code questions is 980-314-CODE (2633). More in our permit guide for Charlotte-area home projects.
Fence height and placement in the City of Charlotte
Inside Charlotte city limits, the city's development ordinance sets these limits for fences and walls in its Neighborhood 1 and Neighborhood 2 zoning districts:
- in the front setback, or a setback along a street frontage: 5 feet above grade
- in the side setback, between the front and rear setbacks: 6 feet
- in the rear setback: 8 feet
- the cap of a post or column may rise up to 2 feet above the limit
- no fence may block the flow of stormwater in a storm drainage easement, or block the sight triangle at an intersection
- a fence inside the public right-of-way needs certification or an encroachment agreement from the city or state transportation department
These are the city's rules only. Huntersville, Matthews, Mint Hill, Cornelius and the other towns set their own, so check with the town's planning office.
HOA and historic review
Many subdivisions around Charlotte have an HOA whose rules on fence height, material, color and location can be tighter than the city's. Get written approval before you sign. In a locally designated historic district, state law also requires a certificate of appropriateness before a fence is put up or changed, whether or not a permit is needed.
Does a fence or deck builder need a license?
A state general contractor license is required when the job is $40,000 or more. Many fence and deck jobs come in below that, where that license is not required. Check proof of liability coverage, a written workmanship warranty and a local address.