Bathroom remodel cost in Charlotte: scope, permits and comparing quotes

Bathroom quotes vary more than quotes for any other home project, because no two contractors picture the same bathroom. Write the scope down once and the quotes become comparable. Do that before any contractor has your phone number.

The short answer

The cost of a bathroom remodel is set by scope: what stays, what moves and what you choose for finishes. Moving plumbing, adding wiring or touching a structural wall also brings permits and licensed trades, which a like-for-like refresh does not. This page gives you a scope sheet to hand to every contractor. It does not give a Charlotte price range, because we have not found one with a method behind it.

Why bathroom quotes are so far apart

A roof has one job and a handful of materials. A bathroom has six or seven trades in a small room: demolition, plumbing, electrical, carpentry, tile, paint and sometimes glass. Each has choices, and each contractor fills in the choices you did not make. Ask three contractors to "redo the hall bath" and you will get one price for new fixtures in the same places, one for a tiled walk-in shower where the tub was, and one that assumes the walls come down to the studs. All three are honest. None can be compared with the others.

The three levels of remodel

RefreshLowestSame layout. New fixtures, vanity, flooring, paint and lighting in the existing positions. Little or no work inside the walls.
Replace in placeMiddleSame layout, but tub, shower, tile and often the wall board behind them are removed and rebuilt. Valves in the wall may be replaced.
ReconfigureHighestFixtures move, a tub becomes a shower in a new footprint, walls move, or the room grows. New plumbing and wiring runs, and often structural work.

Decide which level you want before you ask for quotes. If you are unsure, ask each contractor to price two levels separately.

What drives the cost within each level

  1. Moving water and drains. Leaving the toilet, tub and sink where they are is the largest single saving. A drain moved across a floor means opening the floor, and on a concrete slab it means cutting the slab.
  2. The shower or tub. A one-piece unit, a tiled shower with a built-up pan, and a curbless shower are three very different amounts of labor. Glass is frequently a separate line or missing.
  3. Tile. Square feet, tile size and pattern, niches and benches. Small tiles and patterns take longer. The waterproofing behind the tile matters more than the tile, and quotes should name the system used.
  4. What is behind the walls and under the floor. Old leaks leave rotten subfloor and framing. Nobody can price it before demolition, so look for unit prices or an allowance.
  5. Fixtures and finishes. Vanity, top, faucets, toilet, lighting, fan, mirrors and hardware. Some quotes include these at a stated allowance. Others assume you buy them. An allowance that is too low makes the total look better than it is.
  6. Electrical. New circuits, outlets, lighting and a properly vented fan.
  7. Access and protection. An upstairs bathroom, a home you are living in, and dust control all add time.

Which parts need a permit in North Carolina

State law exempts work costing $40,000 or less on a single-family home from a building permit, with exceptions that apply at any price. Three of them come up in bathrooms.

Swap a toilet, faucet or vanity in the same placeNo permitPlumbing replacements that do not change size or capacity are exempt.
Move a drain or supply line, add a fixture, or convert a tub to a shower with a relocated drainPermitIt adds plumbing or changes the plumbing design.
Replace a light fixture or switch like for likeNo permitLike-kind replacement of electrical devices and lighting fixtures is excepted.
Add a circuit, outlet, fan or new wiringPermitAn addition or change to electrical wiring.
Remove or alter a load-bearing wall, or repair structural framingPermitLoad-bearing work.
Tile, flooring, paint, cabinetsNo permitNot structural and no trade work, at $40,000 or less.
Whole project over $40,000PermitOver the state threshold.

Mecklenburg County requires separate permits for building, electrical and plumbing work, so one bathroom can carry more than one. The county office is Code Enforcement, 980-314-CODE (2633). Our permit guide has more.

Who must be licensed

  • Plumbing. A North Carolina state license is required at any price. The only exemption is for minor repairs and replacements that do not change the routing or sizing of piping.
  • Electrical. Electrical contracting needs a state license, and the statute sets no dollar minimum.
  • The remodeler. A general contractor license is required when the whole job costs $40,000 or more.

So on a typical bathroom remodel the person you sign with may not need a license, but the plumber and electrician they bring do. Ask who those subcontractors are and for their license numbers. Where licensed work is required, the county cannot issue the permit unless a licensed contractor is doing it. Our guide to contractor license rules explains how to check.

A scope sheet to give every contractor

Copy this, fill it in, and send the same version to each one.

  1. Level: refresh, replace in place, or reconfigure
  2. Layout: which fixtures stay where they are, and which move, with a sketch
  3. Tub and shower: keep, replace with the same type, or convert; tiled or one-piece; door, glass panel or curtain
  4. Tile: which walls and how high; floor; any niche or bench
  5. Vanity and top: width, one sink or two, who supplies it
  6. Toilet, faucets and shower valve: who supplies them, and any brand you have chosen
  7. Electrical: new lights, outlets, fan, heated floor
  8. Walls and ceiling: patch and paint, or new wall board
  9. Flooring: material, and whether it runs under the vanity
  10. Door, trim and storage
  11. Home details: which floor the bathroom is on, slab or crawlspace below, and the year the home was built
  12. Timing: when you want to start, and whether it is the only bathroom

If a contractor suggests a change you like, send the revised sheet to all of them.

What to ask for in return

  • A price broken out by trade or by the twelve lines above
  • Named allowances for anything you have not chosen, in dollars
  • Unit prices for subfloor and framing repair
  • The waterproofing system behind the tile
  • Which permits will be pulled and by whom
  • License numbers for the plumber and electrician
  • A schedule, including how long the bathroom will be out of use
  • A payment schedule with the last payment due after final inspection

Homes built before 1978 have one more item: federal rules require firms paid to disturb painted surfaces in those homes to be certified in lead-safe work. Ask for the certification. Our guide on how to compare contractor quotes covers the rest.

How QuoteFlash fits in

Describe the bathroom to our agent using the scope sheet. The agent works for you. It matches you with up to five local contractors who are insured, and licensed where the state requires it, and sends them the same scope. Their written quotes arrive in one place, and the agent shows where they differ and what each left out. You choose which contractors get your phone number. Homeowners pay nothing. Contractors pay when matched. See bathroom remodel quotes in the Charlotte area.

Bathroom remodel questions

Do I need a permit to remodel a bathroom in Charlotte?

It depends on the work. Moving or adding plumbing, adding wiring, and structural changes need permits at any price. Like-for-like fixture swaps, tile, flooring and paint do not, when the job costs $40,000 or less.

Does converting a tub to a shower need a permit?

If the drain or supply lines are moved or the plumbing design changes, yes. Ask the contractor to state in the quote whether the conversion changes the plumbing and who pulls the permit.

Why is one quote double another?

They are almost always for different scopes. Check the level of remodel, whether fixtures move, what the shower is made of, and the allowances for fixtures.

What is an allowance?

A dollar amount set aside in the quote for something not yet chosen, such as tile or a vanity. If you pick something that costs more, you pay the difference. Compare allowances across quotes.

Who needs to be licensed?

The plumber and the electrician, at any price. The remodeler needs a general contractor license when the job is $40,000 or more.

When do contractors get my phone number?

Only when you choose to share it, after you have compared their written quotes.

One minute now. Up to five quotes to compare.

Get my quotesFree, no obligation, and you choose who gets your number
Contractor in the Charlotte area?Get matched with verified homeowners who are ready for quotes.
Apply for your area